The ATG Upgrades for tanks PH10 and PH1 involved the installation of new Honeywell Enraf Automatic Tank gauges fot monitoring of tank level and temperatures. Client: BP Australia Pty. Ltd. Location: Port Hedland Bulk Fuel Terminal Project Duration: 4 weeks Read More
City of Armadale in put out a tender for the installation of single and double outreached 12.5 meter street lighting poles and all necessary infrastructure. This was due to a new dual carriageway being developed by the City of Armadale Read More
The Ultimate Diesel Additive Installation involved the addition of two additive tanks for injection into the existing diesel out-loading lines. Also there was the installation of a transfer line from the Gantry to the new additive tanks. Interlec worked alongside Read More
City of Armadale put out a tender for the installation of double outreached 12.5 meter street lighting poles and all necessary infrastructure. This was due to a new dual carriageway being developed by the City of Armadale to accommodate the Read More
Various rectification and maintenance works were completed in conjunction with other projects at Port Hedland Bulk Fuel Terminals over the last 2 years. Interlec competed works as requested and in conjunction with Terminal Operations, and other contractors. Client: BP Australia Read More