Interlec has completed a vast variety of electrical projects in the following heavy industry sectors:

  • MiningProjects-Interlec
  • Heavy Industrial
  • Power Line Construction
  • Power Generation
  • Electrical -Commercial and Service

Below is a selection of some of the projects we are currently working on or have completed in the recent past.


Interlec Project List

CBH Lake Grace Conveyor Loading System Upgrade

Project Location – This scope forms part of the work for CBH Group’s 2019 Harvest Program in Western Australia. Location of the Works is at CBHs’ Lake Grace Site which is circa 250km or 2 hours 45 mins drive North Read More

CBH Gairdner Converyor Loading System Upgrade Stage 1 and 2

Project Location – This scope forms part of the work for CBH Group’s 2019 Harvest Program in Western Australia. Location of the Works is at CBHs’ Lake Grace Site which is circa 250km or 2 hours 45 mins drive North Read More

Joondalup Drive Street Lighting Upgrade

Duration – Commencement date – 22nd February 2016 / Completion Date 31 December 2016 Scope of Work To liaise closely with the City of Joondalup to construct and provide project management for the following: The upgrade of the existing street Read More

Mirambeena Grain Receival Site Complete Electrical Installation

Long standing client Co Operative Bulk Handling Awarded Interlec WA Pty Ltd the Electrical Contract to complete all Electrical works on new Grain Receival Site Mirambeena. Mirambeena was a much needed addition to the Great Southern grain handling network, and Read More

Ravensthorpe Nickel Project – 2006-07

The project work included the design, procurement, installation and commissioning of the 56 megawatt turnkey Power Plant, including 3 x 18.5 megawatt Steam Turbine Generators, 3 x Distillate Fired Package Boilers, 3 x 1.9 megawatt 11kv Diesel Generator Sets, 2 Read More

Sinclair Nickel Project – 2008

The Plant will be designed to treat 300 000 tpa of ore to produce a saleable nickel concentrate. The basis for process plant design will be the processing of a supergene ore blend, consideration in design will however also be Read More

Higginsville Treatment Plant – 2007

The Higginsville Treatment Plant is designed for a nominal 123tph milling rate, run of mine material is fed to the crushing plant at a design rate of 225 tph with crushed ore storage capacity installed to provide a break between Read More

Salay Malay Paste Plant – 2007

GR Engineering Services (GRES) were awarded a design and construct contract by Kimberley Nickel Mines Pty Ltd to supply a continuous production paste back-fill plant for the Sally Malay nickel mine. The paste plant is designed to filter and then Read More

Abbey Road/Armadale Road Intersection – Street Lighting

City of Armadale in put out a tender for the installation of single and double outreached 12.5 meter  street lighting poles and all necessary infrastructure. This was due to an existing intersection being modified to accommodate an increasing amount in Read More

Beeliar Drive Street Lighting

City of Cockburn put out a tender for the installation of single and double outreached 12.5 meter  street lighting poles and all necessary infrastructure. This was due to an existing single carriageway being developed by the City of Cockburn to Read More

BP Port Hedland General Maintenance, and Additions.

Various rectification and maintenance works were completed in conjunction with other projects at Port Hedland Bulk Fuel Terminals over the last 2 years. Interlec competed works as requested and in conjunction with Terminal Operations, and other contractors. Client: BP Australia Read More

Nicholson Road Street Lighting Stage 1 and Stage 2

City of Armadale put out a tender for the installation of double outreached 12.5 meter  street lighting poles and all necessary infrastructure. This was due to a new dual carriageway being developed by the City of Armadale to accommodate the Read More

Explosive Hazardous Area Electrical & Instrumentation Project

The Ultimate Diesel Additive Installation involved the addition of two additive tanks for injection into the existing diesel out-loading lines. Also there was the installation of a transfer line from the Gantry to the new additive tanks.  Interlec worked alongside Read More

Warton Road Street Lighting

City of Armadale in put out a tender for the installation of single and double outreached 12.5 meter street lighting poles and all necessary infrastructure. This was due to a new dual carriageway being developed by the City of Armadale Read More

BP Port Hedland PH10/PH1 ATG Installations

The ATG Upgrades for tanks PH10 and PH1 involved the installation of new Honeywell Enraf Automatic Tank gauges fot monitoring of tank level and temperatures. Client: BP Australia Pty. Ltd. Location: Port Hedland Bulk Fuel Terminal Project Duration: 4 weeks Read More

BP Port Hedland Effluent Electrical and Instrumentation Upgrade

The Effluent Upgrade Installation involved the installation of all Electrical and Instrumentation equipment supporting the new Effluent Handling System onsite. Client: BP Australia Pty Ltd. Location: Port Hedland Bulk Fuel Terminal Project Duration: 12 weeks Scope of Work Installation of Read More