The project work included the design, procurement, installation and commissioning of the 56 megawatt turnkey Power Plant, including 3 x 18.5 megawatt Steam Turbine Generators, 3 x Distillate Fired Package Boilers, 3 x 1.9 megawatt 11kv Diesel Generator Sets, 2 x 11kv-415v Transformers with associated Earthing Transformers, HV/LV Switchboards, DC/UPS systems, Plant Control System, Instrumentation Aircompressors and associated balance of plant.

After auditing and assessment was carried out on Interlec Pty Ltd’s Occupational Health and Safety and Environmental System, Quality Management System and Financial Capacity Interlec were awarded the Ravensthorpe Nickel Project’s Power Plant Electrical and Instrumentation Construction Installation.

Project Type – Ravensthorpe Nickel Project

Client – Austrian Energy and Environment

Location – Ravensthorpe Nickel Operations, Ravensthorpe, Western Australia

Brief – Austrian Energy and Environment were awarded the turnkey EPC contract to provide a new Steam power plant for BHP Billitons, Ravensthorpe Nickel Operations Pty Ltd in 2004.

The Plant Description as follows

  • Plant Output: 56MWe installed capacity
  • Boilers: 3 x 80t/h Distillate Fired Package Boilers
  • Steam Turbine: 3 x 18.5MWe Steam Turbine Generators
  • Generator: 3 x 1.9MW 11 kv Diesel Generator Sets

Scope Of Work

Supply and Installation of all High Voltage, Power, Control and Instrumentation Cabling and Termination Installation of Plant Instrumentation and associated tubing. Installation of MCC’s, High Voltage equipment, Distribution Boards & Control Cubicles. Supply and Installation of all area lighting and miscellane


 Back To Projects